unnamed(1)

(Published Aug. 31, 2019)

According to Alderman Brendan Reilly’s office, the Chicago Department of Transportation (CDOT) will temporarily close the new section of the Navy Pier Flyover that opened last December on Sept. 3. 

The flyover will re-open in late September.

The closure is required in order to connect the completed segment to the second phase of the project, which is nearing completion. The closure was delayed until after Labor Day to avoid the height of biking season. 

During this closure, pedestrians and bicyclists will be directed with signage to use the old route of the Lakefront Trail at street level across Illinois and Grand on Lower Lake Shore Drive. 

When the trail reopens, the two portions of the trail will connect a temporary bridge to the east sidewalk of the Lake Shore Drive Bridge. A ramp from the Flyover down to Navy Pier and Illinois Street will also be open at that time.

Work will continue through the fall on Phase 3 of the Navy Pier Flyover. It involves retrofitting the existing LSD Bridge with a cantilever structure on the east side of the span that will allow for widening the trail to eliminate the existing bottlenecks users encounter. 

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.